Custom Weld Corp.
(330) 452-3935
1500 Henry Ave. S.w.
Canton, Ohio,
USA
44706
- Year Established:
- 1958
Products & Services
-
- Industrial Machinery
Web Result
- Custom Weld Corporation
- Serving the Welding Needs of Industry Since 1958 Die Repair Component Repair Offsite Repair Consulting Global Assistance Here is a sample of some of the services we offer. We offer our clients an option to repair rather than replace damaged or worn equipment. The end result is our clients getting back up and running in a shorter time and less cost than if they had opted for replacement. Reclamatio...
- Custom Weld Corporation
- Serving the Welding Needs of Industry Since 1958 Components Dies Axial Rolls Cover Holder Blocks Custom Weld prides itself on the quality of it's work and the diversity of our capabilities. Below are some examples. Problem A damaged column for a Chambersburg 35,000# Hammer. Solution Damaged area was flood welded with a HRT-3000 welder. The operation was performed onsite and took only threedays. Ke...
- Custom Weld Corporation
- Serving the Welding Needs of Industry Since 1958 In business since 1958, we have a fairly long history. Any events worthy of note will be documented here as well as a listing of current or upcoming events. Tool and Die Repair. Hardfacing. Overlays. Mig, Tig, Large Diameter Electrode, and Submerged Arc welding. If you don ft see it listed, just ask. We have some of the best and most specialized equ...
- Custom Weld Corporation
- Serving the Welding Needs of Industry Since 1958 Canton, Ohio: Telephone: 330-452-3935 FAX: 330-452-6330 Postal address: 1500 Henry Ave., S.W. Canton, OH 44706 Electronic mail: General Info: Custom Weld Customer Support: T. Savage Website: Webmaster Custom Weld Corp. | 1500 Henry Ave. S.W. Canton, OH 44706 | Tel: 330.452.3935 | Fax: 330.452.6330 | Contact 2000 Custom Weld Corp., All Rights Reserve...
- Custom Weld Corporation
- Serving the Welding Needs of Industry Since 1958 12/22/1998 Heat Treat Furnace (State of the Art...) Any true commitment to excellence cannot be achieved without a corresponding commitment to purchasing/maintaining quality equipment. With this in mind Custom Weld began in mid 1998 to make plans for the purchase of a new heat treating furnace. Full Story 09/01/1997 Web Site (Custom Weld Logs On...)...
Website Links:
Own this business?
Request to update the information