Superior Interlock Corp.
(718) 821-8949
73-39 Central Ave.
Flushing, New York,
USA
11385
http://www.superiorinterlock.com
key interlocks system manufacturer servicing the special needs of domestic and international companies insuring that personnel and equipment are safeguarded.
- Year Established:
- 1947
Products & Services
-
- Key Interlock
- Key Interlocks
- Key Interlock Systems
- Key
- Lock
- Locks
- Safety Interlocks
- Superior
- Interlock
- Interlocks
- Captive
- Safety
- Electrical
- Switchgear
- Lockout/tagout
- Lockout
- Tagout
- Osha
- Sequential
- Process Control
- Solenoid
- Cory Interlock
- Cory-robinson Interlock
- Glendale
- New York
- Ny
- Nyc
-
- Huber
- Koeberl
- Skru
- Time Delay
- Transfer Interlock
- Mechanical Interlock
- Electro-mechanical Interlock
- Safety Key Interlock
- Interlock System
- Customized Interlock System
- Mechanical Interlock System
- Sequential Key Interlocks
- Trapped Key Interlocks
- Controls Safety
- Access Control
- Locks
- Corrosion Resistant
- Stainless Steel
- Switch Yards
- Robotic Safety
- Machine Guarding
- Safety Access Systems
- Electrostatic Precipitators
- Industrial Process Control
- Valves
- Air Pollution Control Equipment
- Uninterruptible Power Supply
Web Result
- Superior Interlock Corporation - Scheme R
- Order duplicate or replacement keys Scheme R This scheme is used to prevent the paralleling of lines #1,2,3 through a common tie bus. Initial Conditions: Line #1 feeds load #1 through breaker #1; Line #2 feeds load #2 through breaker #2; Line #3 feeds load #3 through breaker #3. Tie breakers #1,2,3 are locked open with no keys present. Breakers #1,2,3 are closed with their respective keys "A &...
- Superior Interlock Corporation - Scheme L
- Order duplicate or replacement keys Scheme L This scheme is used to prevent the paralleling of lines #1 and #2; performing the operation of switches #1 and #2 under no-load conditions. Initial conditions: Line #2 supplies load #1 through switch #2 which is normally locked closed with interlock key "B" captive in its lock open position interlock; breaker #1 is closed with its "A" key captive in its...
- Superior Interlock Corporation - Scheme E
- Order duplicate or replacement keys Scheme E This scheme is used to prevent the opening of the non-load break disconnect switches while the breaker is closed; insuring the disconnect switches are locked open and the breaker isolated by the removal of and evidence/hold-off key, or using the evidence/hold-off key for testing/servicing of the breaker. Requiring an initiation key to release the breake...
- Superior Interlock Corporation - Scheme F
- Order duplicate or replacement keys Scheme F This scheme is used to prevent access to the disconnect switch enclosures while the breaker is closed. Initial Condition: Breaker #1 is closed with key "A" captive in its respective key interlock. Switch #1 and #2 enclosures are locked closed with no keys present in their respective key interlocks. The 3-key transfer interlock has two "B" keys captive i...
- Capacitor Bank Access Scheme
- Order duplicate or replacement keys Capacitor Bank Access Scheme The Capacitor Bank Access Scheme is used to prevent closure of the ground switch under load and ultimately gain access to the capacitor bank area after the capacitor bank has been grounded and fully discharged. Initial Conditions: The breaker is normally closed with its respective interlock key "A" captive; the time delay key interlo...
Website Links:
Superior Interlock Corp. | "Do Not Duplicate" | Air Pollution Control... | Capacitor Bank Access Scheme | Download complete set... | Installation Instructions | Interlock System Access... | Key Flow Diagrams, Conventions... | Key Interlocks and OSHA... | Map to Superior Interlock... | MS Works Format | Order duplicate or replacement... | Ordering Information | Recommended Maintenance | Some Typical Key Interlock... | The Principle of the... | Type B-1088 Superior... | Type B-1088-2T Superior... | Type B-1496 Superior... | Type B-3003 Superior...
Own this business?
Request to update the information